Objective:  

To continue to progress my experience in Project Management with a safety focused company.
 
Employment:  Valvoline Oil Company
1 Year(s)
Initiated, planned, and executed multiple plant improvement/cost savings projects of varying scale o Machine refurbishments, safety upgrades, efficiency improvements  Coordinated portions of multiple diverse capital projects up to $6.1 MM including: o Tank Farm 2 Renovation: Addition of (9) new storage tanks and associated piping, pumps, and controls ($6.1MM) o South Plant Expansion: Demo and replace building, fire suppression and equipment charging stations (5.2MM)  Root Cause Analysis / resolution implementation of global and domestic customer product complaints  Ensured full functionality and proper documentation of critical life safety equipment and procedures o Fire suppression system, fall protection, lethal gas monitors, LOTO, hot work permitting  Managed maintenance department o Developed and implemented work order system for (5) person maintenance team o Delegated varying work tasks to direct reports including training, project work, work orders, and PM orders o Discovered need, developed proposal, and gained approval for hiring two more direct reports to maintenance team at an overall savings to plant
 
  PAE - NASA Contractor
2 Year(s)
Led multi-discipline design engineering team to successful design of renovation projects up to $600k in construction cost o Utilized engineering principles, codes, formulas, charts, and other resources to adequately design systems and processes relating to HVAC, mechanical equipment, fire protection, and plumbing o Utilized 2D modeling program (Microstation) to professionally display mechanical designs in accordance with applicable codes, standards, and policies o Engineering team disciplines: Mechanical, Electrical, Plumbing, Structural, Architectural, Civil, and Fire Protection o Coordinated work with engineering, maintenance, construction, operations, estimating, procurement, sub-contractors, and NASA project managers o Analyzed, researched, and resolved constructability issues that arose pre and post 100% design submittal  Initiated and implemented monthly Lunch & Learn program for all internal engineers and managers o Program intent was to advance design engineers’ knowledge base while allowing for multi-discipline cross-training o Negotiated with upper management for approval of program and time slot o Coordinated with multiple outside vendors to develop and present relevant emerging technologies/code updates
 
  Domtar Paper Co-Op
2 Year(s)
Managed multiple capital and high value projects totaling $665k including:  Boiler Fuel Auger Removal Process Improvement o Designed a safer, more efficient monorail system to maneuver auger (5,000lb, 20’ long) outside of building to fit-for-purpose platform to allow for crane hoist during annual preventative maintenance o Requested and received $50k funding from project management, developed project timeline, managed creation and approval of engineering drawings, and organized third party fabrication and construction services o Managed teams of engineers, boilermakers, insulators, pipe fitters, and safety supervisors to safely install monorail and external platform system on schedule and under budget o Overcame unexpected issues such as improperly functioning valves and outdated equipment removal o New system is currently in use, greatly enhancing safety and reducing annual PM time by 15%  Mill Air Quality/Flow Improvement Project o Refined project scope to enhance process air line routing, and to install multiple new air filters and dryers o Developed timeline and allocation of $575k budget for third party services to complete work on truncated downtime schedule  Plant Wide Mill Water Line Insulation Installation o Developed project scope for installation of new water line insulation for 4”-15” water lines plant wide o Prioritized individual lines, requested and received $40k funding and oversaw insulation implementation
 
 
 Education:  

 
  

 
  University of Tennessee
Bachelor of Science
During college, I worked a total of 5 semesters worth of engineering Co-Ops and Internships. I have had two jobs since graduation where I learned what it takes to propose, design, fund, coordinate, construct, implement, and document a multitude of different project types. My projects in the past include everything from coordinating multi-million dollar building expansions with plant operations, design of building renovation including HVAC, plumbing, and fire protection, ergonomic evaluations and improvements of assembly lines to time critical outage work. Safety is always my number one concern when working with people from external contractors to internal employees and managers. I also possess the soft skills required to achieve an efficient work environment regardless of the situation. Since my experiences and interests line up directly with the position’s qualifications and duties, I am an excellent candidate for this position. I would love a chance to further discuss my qualifications with you in an interview. Thank you for your consideration. I look forward to hearing from you soon.
 
 

Contact Dale H. Mullin at (615)305-3059 or email at mullinco@isdn.net. Please list this person's id number and our job field listing you found him/her under. (i.e. Company Officers) The job field is listed under the person's name at the top of this page.